Go to content

project: comprehensive tenement improvement (CTI)
client: linthouse housing association
cost: £3.1 million
location: hutton drive, glasgow
architect: mark smith
completion date: may 2019


On behalf of Linthouse Housing Association, Grant Murray completed a comprehensive tenement improvement to 11, 13, 19 & 20 Hutton Drive. As part of the proposed works the external fabric was upgraded along with a significant re-design of the internal layouts to provide modern day living space standards. This included demolishing almost the entire internal structure, except for the close walls & constructing a new internal timber kit.
 
Three out of the four tenements were set within a conservation area, which strongly influenced the external material specification. The extent of works included stonework repairs, renewal of front & rear close entry doors, new flat entrance doors, full window replacement, new gutters & downpipes, roof renewal (natural slate to properties within Conservation Area), new bathrooms & kitchens, comprehensive re-design of internal layout, thermal improvements including new central heating system & internal insulation to external walls of all flats & new separating floor & wall construction to improve sound performance. The completed flats offer greatly improved living standards in terms of both energy efficiency & special arrangements,  to provide more comfortable living conditions.

projects I refurbishment I hutton drive
Back to content